GEMopt

LCTPC meeting(July 11th, 2019)

[Main discussion point]
・Cut optimization
・Glass GEM simulation
・2 track separation
 
Agenda & minutes :https://kds.kek.jp/indico/event/31844/

Undefined

LCTPC meeting(July 4th, 2019)

[Main discussion point]
・Glass GEM simulation
 
Agenda & minutes :https://kds.kek.jp/indico/event/31781/

Undefined

LCTPC meeting(June 27th, 2019)

Main discussion point: Drift length calibration, Jig fot GEM thickness gauge
Agenda:https://kds.kek.jp/indico/event/31739/

Undefined

LCTPC meeting(June 20th, 2019)

[Main discussion point]
1.Drift length calibration
2.jig for thickness gauge
 
Agenda & minutes :https://kds.kek.jp/indico/event/31655/

Undefined

2017.3.9

【General things】
・The FUJIKURA company delivered two 10*10 cm^2 gating GEMs as test samples. How do we use ?
news170309.pdf
 
・The annual JPS (Physical Society of Japan) takes place from 17th March to 20th March.We usually have a rehearsal/practice talk for speakers before an actual talk. If you give it, please prepare it.
 
【Reports】
 
・Weekly update(by Y.Aoki@SOKENDAI)
 
【Discussions】

Undefined

2017.1.19

【General things】
  None
 
【Reports】 
・Simulation study on impact of GEM geometry for gas gain uniformity ->archive
https://arxiv.org/abs/1701.05421
  (by T.Ogawa from SOKENDAI)
 
・Analysis of result of transmission with correction at beam test
lctpc2017.01.19shojia.pdf
  (by A.Shoji from Iwate Univ.)
 

Undefined
Subscribe to RSS - GEMopt