Reports/transparencies from WG6 ( FFIR, Beam Delivery System ) group in
ISG
ISG5
meeting, 22-25,February, 2000 at SLAC
Brief report by T.Tauchi.
H.Yamaoka, JLC QC support system,
pdf, 29pages, 6.85MB
T.Tauchi, Pair monitor,
pdf, 22pages, 2.1MB
T.Tauchi, Luminosity monitor and active mask,
pdf, 16pages, 542KB
ISG4 meeting, 19-21,
July, 1999 at KEK
Summary of WG6 (pdf,3 pages) by
T.Tauchi.
H.Yamaoka, Analysis on support tube,
pdf, 18pages or
tif, 18pages.
T.Tauchi, Comparison of ABEL, CAIN and Guinea-Pig focused on incoherent
pair production,
pdf, 29 pages,
and a note on the comparison.
The other talks can be seen in a web-page of
isg4 meeting.
I
SG3 meeting, 25-28,January, 1999 at SLAC
Y.Sugimoto, Neutron background from QC1 at JLC,
pdf, 10pages
Y.Namito, Muon BG estimation for 1997-type JLC,
pdf, 8pages and
a note (6
Mar.1997,RAD-D-97/2(KEK) ) pdf, 1page and
the second note (20
Jan.1999,RAD-D-98/22(KEK) and
LCC-0009 ) pdf, 6pages. You can also see the notes in
tif format, 6pages.
ISG2 meeting,
13-16,July, 1998 at KEK
Major results of this study can be seen by following files;
Title papge of summary report,(postscript)
Summary table (1),(postscript)
Summary table (2),(postscript)
Summary table (3),(postscript)
Summary table (4),(postscript)
Preliminary goal at ISG3,(postscript)
You can see the PDF file by clicking
here.
tauchi@jlcux1.kek.jp