Documents on the JINR test modules.
31-July-2003 ;
Mega-Strip Layout for JINR production.
31-July-2003 ;
Scintillator spec for JINR updated.
31-July-2003 ;
Schematic drawing around the gap.
31-July-2003 ;
Tile Design for JINR production updated.
30-July-2003 ;
Mega-Tile Layout for JINR production.
31-July-2003; Photo of sample tiles are
here
.
19-Feb-2004 ; Photo of JINR-EMcal.
front
and
rear
(to be further assembled).
10-Mar-2004 ; Documents on JINR-EMcal.
Detector-DAQ mapping
Detailed mapping
PMT anode number
PMT anode number
10-Mar-2004 ; Photos of JINR-EMcal.
Left-side
Right-side
Right-side
Close-up of PMT connector
Top-view
10-Mar-2004 ; Drawings of JINR-EMcal.
Layer-Layout
Numbering Scheme
Fiber-ganging scheme
Tile Design
Return to BT2004-archive