--------------------------------
Weekly JLC Physics Group Meeting
--------------------------------
Place: 3F Bldg 3, KEK
Time:  10:30, 97/06/13

[0] Agenda
   
   0.1) VTX R&D Status
   0.2) CAL R&D Status
   0.3) CDC R&D Status
   
   	
[1] VTX R&D Status (Kuniya)

	Kuniya from Saga Univ. reported preliminary results from
	the beam test.
	The pulse height spectra after 3x3 clustering show a clean
	pion peak well separated from noise for both plus and minus
	charge data taken at 15C with a readout time of 1.3sec.
	
	

[2] CAL R&D Status (Y.Fujii)

	Y.Fujii summarized the last beam run:	
	
	================  Run Summary of T411 Beam Test  ================
                                   13-June-1997
	Based on the on-line run summary made by Kanaya-san's DAQ program.
	         Added conditions based on log-books by Y.Fujii.

	[CONTENTS]
	( 0) Run0013-0055 = Tuning
	( 1) Run0056-0081 =  6:2 
	( 2) Run0105-0121 = 10:2
	( 3) Run0123-0151 =  8:2
	( 4) Run0175-0194 =  4:2 
	( 5) Run0195-0218 =  8:2 + 4:2(40Layers)
	( 6) Run0269-0299 =  8:2 + 4:2(30Layers)
	( 7) Run0320-0326 =  8:2 check ( 4GeV and 2GeV only) 
	( 8) Run0336-0392 =  8:2+2
	( 9) Run0393-0422 = 16:6
	(10) Run0427-0445 = 16:4
	(11) Run0449-0469 = 16:2
	(12) Run0480-0491 = Diverse Runs with 16:2
	(13) Run1001-1040 = GSO runs with 8:2

	================================================================= 

[3] CDC R&D Status (Norik)

	Planning to  measure the gas gain as a function of the
	surface field on a 30micron sense wire, varying gas
	mixing ratio. A small cylindrical proportional counter
	has just been completed for the gain measurement.
	The measurement will take place in KEK-Tanashi and the
	first result will be available by the end of July.
	

fujiik@jlcux1.kek.jp