--------------------------------
Weekly JLC Physics Group Meeting
--------------------------------
Place: BLDG 3, KEK
Time: 10:30, 97/02/28
[0] Agenda
0.1) General Notifications
0.2) CAL Subgroup Status
0.3) CDC Subgroup Status
[1] General Notifications
1.1) Apple Talk Problem (Miyamoto)
Finally the apple talk problem was solved. In order to
prevent such a problem in future, reorganization of
apple talk zones is being planned.
Local talk support will be terminated eventually.
A.Miyamoto will take care of the configuration of the
JLC related zones.
1.2) OS Upgrade for JLCUXs.
OS Version up to HP-UX10.10 is planned on March 13-14.
1.3) Kakenhi Report
0-th version is completed and will be available in
the JLC tea room.
Check at least the author list on a group-by-group
basis.
The final version should come out by the end of
the next week.
[2] CAL Subgroup Status (Y.Fujii)
2.1) Newface
Tanaka from Konan Univ. is going to participate in
the calorimeter beam test.
2.2) Beam Test
Hardware setup is almost finished and detector tuning
with beam will begin soon.
[3] CDC Subgroup Status (Yamaguchi)
Continuing cosmic ray data taking for slant tracks
near the signal-side end of the chamber.
First analysis results are expected in a week.
fujiik@jlcux1.kek.jp