Meeting of Funding Agencies to discuss the status and funding prospects for a linear collider of 0.5 – 1TeV. 30 July 2003, London, UK
1. A meeting was held on 30 July 2003 of representatives from Canada (NSERC), CERN (President of Council and DG), France (CNRS), Germany (BMBF), Italy (INFN), UK (PPARC), and the US (DOE, NSF, OSTP). It was recognised that the scientific committees have established a need for future facilities of such a scale that an international forum of potential funding agencies/sponsors was needed. This meeting was an informal body to share views and opinions on prospects and issues in each of the states involved. The group discussed the status of current funding for a linear collider (LC) and their perceptions of the prospects for the future.
2. All agencies recognised the immediate priority of successful completion of the LHC for the future of particle physics reseach. At a political level there was a need to set the case for a proposed linear collider in an overall global strategy for future opportunities in high energy physics and to identify the technologies and expertise that needs to be maintained for opportunities beyond a LC. It was agreed that the remit of the committee be widened to consider the future programme of particle physics.
3. The group recognised that a requirement of some of the agencies and governments would be a need to see three distinct phases of a proposed LC project, with decision points between the phases. These three phases would be a) an R&D phase, (presently ongoing) by the end of which the main technology choices would be made, b) an engineering design phase, the output of which would be the optimised technologies and a fully costed construction proposal , and c) a construction phase.
4. It was believed that the initial R&D design phase could be funded through existing funding routes and structures in the participating states with a light coordination. However, there was a need for global governance and specific funding of the engineering phase and the establishment of an international design team to carry out this phase.
5. The group discussed the desire of the scientific community for concurrent running of a LC with the LHC. Commissioning of a LC in 2015 could provide 5 years of concurrent running with the LHC. It also discussed the importance of maintaining a viable community of physicists and engineers who would ensure the vitality of the field in future.
6. The group believed it important that the
technology choice report to be made by the International Committee for Future
Accelerators (ICFA) group should be completed in a timely manner, on its
proposed timescale by the end of 2004, and detail the technical rationale for
the choice. It was also felt that a technology choice, as a matter of principle,
should not prejudice a site selection.
7. It was expected that the technology choice would not exclude continued low level research into other technologies important for future developments for the LC and other facilities in the field.
8. The group did not discuss the relative
merits of possible sites but recognised that many of the project governance
issues would be influenced by the site choice. Hence, it
was agreed that the choice of site should be made as early as possible in the
engineering design phase. à Y.Totsuka does not agree.
9. The group agreed to hold a further informal meeting in February/ March 2004 at which it hoped that representatives of the Asia area could be present. Items for discussion would include the overall strategy for high energy physics, potential governance models for a LC and impact on these of the site choice, and a first discussion of project management structures.
Jms
2 September 2003