PreGLCC viewed from Japan (as of 030924)

Y.Totsuka for KEK

 

PreGLCC is an international organization prior to GLCC which is to build, operate and maintain the linear collider and detector.

 

1.     Organization: based on MOU between laboratories and universities

2.     Organizational structure
head quarter, three regional centers and a council

3.     Head quarter

      Coordinate tasks of regional centers

      Make reports to ICFA (= council)

      Members supported by laboratories to which they belong

      Other funds supported by relevant laboratories and/or countries

      Venue: a laboratory other than DESY, KEK, SLAC
preferably outside the US unless the current visa problem is solved

      Members of the head quarter
group leader (1), coordinator for overall LC (1) and basic LC components (*), coordinators for detector and physics (3), coordinator for site studies in each region (3), contact person to funding agency organizations (1), administrators (1), secretaries (2)
total 12+*

4.     Regional centers

      Carry out items coordinated by the head quarter

      Report status and results to the head quarter

      Members supported by laboratories to which they belong

      Other funds supported by relevant laboratories and/or countries

      Venues:
American center: , Asian center: KEK, European center

      Members are defined by each responsible laboratory

5.     Council

      Members: ICFA members

6.     Charge:

      Carry out and complete all items necessary for the linear collider and detector to be funded and to be built.

7.     Relation to funding agencies

      PreGLCC is initially independent of funding agencies

      When the funding agencies play roles in preGLCC is determined by a group formed by the funding agencies

8.     Items included in the charge

1D    Make overall scheduling

2D    Define the contents of CDR (including the detector)

3D    Make CDR and engineering R/D plan (including the detector)

4D    Make assignments of work to regional centers

5D    Carry out engineering R&D for the linear collider and detector

6D    Make construction-ready TRD (feasibility demonstration, industrialization, reliable cost estimate, including the detector)

7D    Review progress of work at regional centers

8D    Establish the best way of the site selection

9D    Establish coordination with funding agency organizations

10D Define organization, schedule of GLCC

9.     Schedule
(Numbers correspond to the items shown above)

      2005: 1, 2, 3, 4, 5

      2006: 5, 7

      2007: 5, 7, 6, 8, 9, 10

      2008: 8, 9
select site by calling a bid to interesting countries / regions,
establish GLCC

      2009: start the linear collider and detector construction

10.  Comments

      We do not divide preGLCC to two phases, because the period before the construction is only 3 – 4 years which are too short.

      It may not be appropriate to work on the detector separately, judging the number of experiments (one, and later one more), and manpower and cost of the detector.

      We prefer the funding agencies not involved in the organization.

      We prefer the site selection as late as possible.