Hiroshima Beam Test 2000

We are making a beam test of our baby chamber to study its 2-track separation capability, using electron-positron pairs produced by bremsstrahlung photons from the internal target of REFER (Relativistic Electron Facility for Education and Researches) in Hiroshima University. This page summarizes the current status of the experiment.

What's New?
Schedule
Run Summary
Picture Gallery

What's New?

Schedule

Run Summary


Run##eventsTriggerTargetChamber PositionComments
830 300 T1(s).T2(s).CsI 1mm-thick Pb 6.1cm (0cm) single track/cell 1 T0
832 300 T1(s).T2(s).CsI 1mm-thick Pb 11.1cm (5cm) single track/cell 2 T0
833 1000 T1(s).T2(s).CsI 1mm-thick Pb 7.1cm (1cm) single track run
834 1000 T1(d).T2(s).CsI 1mm-thick Pb 7.1cm (1cm) double track
835 2000 T1(d).T2(s).CsI 1mm-thick Pb 7.1cm (1cm) double track
836 2000 T1(d).T2(s).CsI 1mm-thick Pb 7.1cm (1cm) double track
837 2000 T1(d).T2(s).CsI 0.5mm-thick Pb 7.1cm (1cm) double track
838 100 Clock pedestal run
840 1000 T1(d).T2(s).CsI 0.25mm-thick Pb 7.1cm (1cm) double track
841 2000 T1(d).T2(d) 0.25mm-thick Pb 8.6cm (2.5cm) 2-track for T1/2 but w/o CsI
842 1000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.6cm (2.5cm) restored CsI, two-track run
843 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.6cm (2.5cm) two-track run
844 1000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.6cm (2.5cm) two-track run
845 355 T1(d).T2(d).CsI 0.25mm-thick Pb 8.6cm (2.5cm) two-track run
846 100 Clock pedestal run
847 100 Clock pedestal run
848 1000 T1(d).T2(d).CsI 0.25mm-thick Pb 9.6cm (3.5cm) two-track run
849 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 9.6cm (3.5cm) two-track run
850 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 7.1cm (1cm) two-track run
851 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 7.1cm (1cm) two-track run
852 100 Clock pedestal run
853 100 Clock pedestal run
854 100 Clock pedestal run
855 100 Clock pedestal run
856 500 T1(d).H1sum.H2or.CsI 0.25mm-thick Pb 7.1cm (1cm) 1st run w/hodoscopes
857 374 T1(d).H1sum.H2or.CsI 0.25mm-thick Pb 8.1cm (2cm) 1st run w/hodoscopes
858 501 T1(d).H1sum.H2or.CsI 0.25mm-thick Pb 8.1cm (2cm) H1(att +20dB for H1sum for ADC)
859 366 T1(d).H1sum.H2or.CsI 0.25mm-thick Pb 8.1cm (2cm) H1(H1sum thresh. 150mV)
860 1828 T1(d).H1sum.H2or.CsI 0.25mm-thick Pb 8.1cm (2cm) H1(H1sum thresh. 150mV & att +20dB)
861 100 Clock pedestal run
862 100 Clock pedestal run
863 500 T1(d).T2(s).H1sum.H2or.CsI 0.25mm-thick Pb 8.1cm (2.5cm) restored T2(T2 thresh. 30mV & att +0dB), H1(H1sum thresh. 150mV & att +20dB)
864 500 T1(d).T2(d).H1sum.H2or.CsI 0.25mm-thick Pb 8.1cm (2.5cm) T2(T2 thresh. 80mV & att +13dB), H1(H1sum thresh. 30mV & att +20dB)
865 500 T1(d).T2(d).H1sum.H2or.CsI 0.5mm-thick Pb 8.1cm (2.5cm) moved T2(T2 thresh. 80mV & att +13dB), H1(H1sum thresh. 150mV & att +20dB)
866 266 T1(d).T2(d).H1sum.H2or.CsI 0.5mm-thick Pb 8.1cm (2.5cm) T2(T2 thresh. 80mV & att +13dB), H1(H1sum thresh. 150mV & att +20dB)
867 100 Clock pedestal run
868 100 Clock pedestal run
869 500 T1(d).T2(d).H1sum.H2or.CsI 0.5mm-thick Pb 8.1cm (2.5cm) CsI(CsI thresh. 30mV & att. 12dB), T2(T2 thresh. 80mV & att +13dB), H1(H1sum thresh. 150mV & att +20dB)
870 1000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) two-track run
871 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) two-track run
872 561 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) two-track run
873 100 Clock pedestal run
874 100 Clock pedestal run
875 1000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) theta = 30, two-track run
876 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) theta = 30, two-track run
877 2000 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) theta = 30, two-track run
878 1300 T1(d).T2(d).CsI 0.25mm-thick Pb 8.1cm (2.5cm) theta = 30, two-track run
879 100 Clock pedestal run

Picture Gallery


Back to CDC Home Page
kurihara@jlcux1.kek.jp Oct 6, 2000