Photo Gallery of HCAL setup in T405 in 1996
Inserting Pb-plates into HCAL.
Lifting up a Pb-plate from a hanger.
Lead blocks to put backup CAL on them.
Iron block to put backup CAL on it.
Completed base for backup CAL.
Putting backup CALs on their base.
Adjusting position of backup CALs.
HCAL in the black-box light shield.
Beam line setup and HCAL in BB.
Beam line setup and HCAL in BB with T.S..
Connecting cables to NIM modules.
Overview of total setup-1.
Overview of total setup-2.
Sideview of HCAL and BUCAL.
Rear View of the total setup.
Side-Rear view of the total setup.
Return to T405 index page
Return to CAL home page